4 mounting, 1 general instructions, 2 instructions for installation – VEGA VEGABAR 14 User Manual
Page 9: 3 mounting steps, 4mounting
4
Mounting
4
.1 General instructions
M
ake sure that all parts of the instrument exposed to the process, in
particular the sensor element, process seal and process fitting, are
suitable for the existing process conditions. These include above all
the process pressure, process temperature as well as the chemical
properties of the medium.
Y
ou can find the specifications in chapter "Technical data" or on the
type label.
4
.2 Instructions for installation
VEGABAR
14
functions in any installation position. It is mounted
according to the same directives as a manometer (DIN EN 839-2).
Information:
W
e recommend using lock fittings, measuring instrument holders and
siphons from our line of accessories.
4
.3 Mounting steps
F
or mounting VEGABAR 14, a welded socket is required. You can find
these components in the supplementary instructions manual "Welded
socket and seals".
U
se the attached seal:
l
P
rocess fitting GV, GB and GP
-
or -
S
eal the thread with teflon, hemp or a similar resistant seal material:
l
P
rocess fitting GN
à Screw VEGABAR 14 into the welded socket. Tighten the hexagon
screw on the process fitting. Wrench size, see chapter "Dimen-
sions", torque see chapter "Technical data".
Suitability for the pro-
cess conditions
Mounting position
Welding the socket
Sealing/Screwing in
VEGABAR
14
9
4 M
ounting
22441
-
EN
-111006