beautypg.com

Installation – Ohaus MB23 MOISTURE ANALYZER Manual it User Manual

Page 4

background image

EN-2 MB23 / MB25

2. INSTALLATION

Package Contents

Moisture Analyzer
Draft Shield
In-Use Cover
Pan Support
Power Cable

50 Sample Pans
Glass Fiber Pad
Instruction Manual
Sample Pan Handler (MB25 only)

Selecting the Location

Operate the Analyzer on a firm, level surface.

Select a location that is safe and with adequate ventilation.

Fire, corrosive or toxic fumes and other hazards associated

with the test samples will require specially prepared locations.

Ensure that the location has easy access to the local AC power supply.

Avoid locations with rapid temperature changes, excessive humidity, air currents, vibrations, electromagnetic fields,
heat or direct sunlight.

Installing Components

(1) Install and position Draft Shield

(2) Install Pan Support, turn until it

engages into position

Optional Sample Pan Handler - Slide an

empty sample pan under the pan

handler, then place over the pan

support.

Connecting Power

Verify that the input voltage printed on the voltage identification label information
and the plug type matches the locations AC power supply.

Connect the supplied power cable to the power input receptacle at the rear of the
Analyzer and into a properly grounded power outlet.

Power: On (short press) / Off / Standby Mode (long press)
When powered on from standby mode, the Analyzer is ready for immediate use.

See also Section 1, Safety Precautions.

After connecting the Analyzer to the AC supply (standby mode), allow the Analyzer to warm up for at
least 15 minutes for best results.