Installation commissioning, Commissioning, Maintenance – STIEBEL ELTRON SBP E с 01.10.2012 User Manual
Page 13: 4 installation versions, 1 commissioning, 2 decommissioning
![background image](/manuals/238288/13/background.png)
EN
GL
ISH
www.stiebel-eltron.com
SBP E | SBP E SOL | SBP E cool |
13
InStaLLatIOn
commissioning
6.4 installation versions
6.4.1 installing the immersion heater
The immersion heater is used for electric booster heating.
- With the SBP 200 | 400 the immersion heater can be mounted
on the r.h. or l.h. side.
- One or two immersion heaters can be mounted with the
SBP 700.
f
f Remove the cap from the connector.
f
f Undo the vent plug with an SW 32 socket spanner.
sBP e | sBP e cool
26
�0
3�
01
�0
22
8
sBP 700 e | sBP 700 e sol
26
�0
3�
01
�0
22
7
7. commissioning
7.1 commissioning
Commissioning must only be carried out by a heating contractor.
f
f Fill and vent the appliance.
f
f Check the functions of the accessories in accordance with the
operating and installation instructions supplied with them.
f
f Check the function of the on-site safety valve.
7.2 decommissioning
If the heating system is not in operation and the installation
location is not protected against frost, drain the appliance and
connected system. This is relevant where there is a risk of frost.
8. maintenance
No special maintenance is required for the appliance. A regular
visual check is sufficient.