Ring operations test, Close nic test, Group 2 diagnostic – 3Com 3C319 User Manual
Page 82: Running the diagnostic tests, Ring operations test 9-4, Close nic test 9-4, Group 2 diagnostic 9-4, Running the diagnostic tests 9-4

9-4
C
HAPTER
9: T
ROUBLESHOOTING
NIC I
NSTALLATION
Ring Operations Test
This test assesses communication on the ring. The 
3C319 NIC must be attached to the ring to run this test 
successfully. The 3C319 NIC also must be set to the 
correct ring speed. Note that this test always fails when 
you are using a Dedicated Token Ring (DTR) hub.
Close NIC Test
This test verifies the 3C319 NIC’s ability to close the 
3C319 NIC and terminate the Ring Operations Test. The 
3C319 NIC must have been previously opened.
Group 2 Diagnostic
The Group 2 diagnostic test (NIC Wrap Test) causes all 
user-transmitted data to be sent and received without 
going to the network.
A lobe cable must be connected from the selected 
3C319 NIC to a retiming concentrator or MAU for the 
Group 2 test. A lobe cable is the section of cable that 
attaches a ring station or network device to a MAU or 
wiring hub.
Running the Diagnostic Tests
The Configuration and Diagnostic Program can be 
started from the menus or the DOS command line. For 
command line instructions, see the INSTRUCT.TXT file in 
the \HELP subdirectory on TokenDisk diskette #1.
1 Insert TokenDisk diskette #1 in the floppy drive
and type:
a:\ [Enter]
2 To start the diagnostic program, type:
3trdiag [Enter]
The Configuration and Diagnostic Program main window 
appears, as shown in Figure 9-2.
3 Use the arrow keys to select the Test pull-down
