beautypg.com

Weil-McLain GOLD CGt SERIES User Manual

Page 2

background image

2

A. Acceptable

boiler/burner

manufacturer(s) include(s):

1. Weil-McLain only, as specified in Part 1, Paragraph C.

a) Other manufacturer(s) or other Weil-McLain boiler(s) must comply

with specifying engineer’s requirements, including: Full intent of these
specifications, and provide complete submittal including literature,
wiring diagrams, fuel piping diagrams, and a list of similar
installations.

b) Submittal to be presented to specifying engineer at least seven

working days for approval before bid opening.
Substitutions are not permitted after contract is awarded.

c) Energy Management Control System(s) must be tested and approved

for installation with specified boiler by boiler manufacturer.

B. Boiler

construction

1. Boiler

sections

a) Assembled with tie rods.
b) Parallel ground sealed with high temperature silicone sealant to assure

permanent gas-tight seal.

c) Sealed water-tight by elastomer sealing rings, not cast iron nipples. Each

port opening is machined to accept elastomer sealing rings between
sections.

d) Provided with sufficient tappings to install required controls.

2. Boiler(s)

a) Provided with cast-in air elimination to separate air from circulating water.
b) Provided with expansion tank tapping to divert separated air to expansion

tank.

c) Constructed to provide balanced water flow through entire section

assembly using single supply and return connections for water. No
external headers are necessary.

d) Designed with a low silhouette to provide maximum headroom.
e) Elastomer sealing rings are to be used to provide permanent water-tight

seal between sections. Unlike cast iron or steel push nipples, the
elasticity of the seals fills any gaps caused by misalignment or expansion
or contraction.

f) Constructed with high-grade stainless steel burner tubes.
g) Shipped with insulated heavy gauge steel jacket(s) with durable

powdered paint enamel finish. Jacket shall have two piece top panel for
easier servicing.

h) Provided with built-in tankless heater and 3-way valve for domestic

priority.


C. Boiler

foundation(s):

Installer to construct needed support and level concrete foundation(s) where
boiler room floor is uneven or will not support the weight of the boiler(s).

D. Boiler

trim:

1. All electrical components to be of high quality and bear the U.L. label.