beautypg.com

Coupler ring “locked” position, Deck counterweight spring installation, Assembly instructions – Walker MC (20 HP) User Manual

Page 24

background image

Assembly Instructions

20

IMPORTANT: To prevent damage to the
mower, make sure the PTO shaft assembly is
securely locked on the tractor, with the locking
balls fully seated in the groove and the ring in the
full forward position (refer to the Coupler Ring
“Locked” Position
photo). After installation,
pull on the shaft to check for security.

Coupler Ring “Locked” Position

8. Raise the mower body (instead of lifting the

front of deck) and clip the counterweight springs
to the receptacle on front of body. Lower the
body to tension the springs. (Refer to Deck
Counterweight Spring Installation
Photo.)

9. With the counterweight springs connected, the

weight on the deck caster wheels should be
15 to 25 Ib (6.8 to 11.3 kg). Check this weight
by lifting on the front of the deck carrier frame. If
required, the spring tension can be adjusted by
tightening or loosening the elastic stop nuts
located underneath the lower spring hook.
Refer to Deck Counterweight Spring Installa-
tion
photo.

Deck Counterweight Spring Installation

Spring-Loaded Coupler Ring

In Fully Forward Position

Hitch Pins

Lock Deck On

Support Arms

Spring Tension Adjustment

Nut Located Under Lower

Spring Hook (Not Visible)

Counterweight Springs

Clip Onto Body

With Body Tilted Up