Final adjustments
VII
1. Follow
EGH Manual
instructions for
Final Adjustments
, Section VII,
including filling the boiler and skimming steam boilers.
Skimming the boiler as described in Section VII of the
EGH Manual
requires firing the boiler. Always follow
boiler
Operating instructions
, Figure 11, when starting
the boiler. Failure to do so could result in severe personal
injury, death or substantial property damage.
2. Inspect base insulation as instructed in Section VII of the
EGH Manual
.
Before proceeding:
1. Follow
Operating instructions
, Figure 11, to start boiler.
2. If boiler starts correctly, proceed with
Check-out procedure
, Section
VIII of this Supplement.
3. If boiler fails to start, check:
❏ Loose connection or blown fuse?
❏ Limit setting below boiler water temperature or steam pressure?
❏ Thermostat below room temperature?
❏ Manual reset device needs to be reset?
❏ Gas not turned on at meter and boiler?
❏ Incoming natural gas pressure less than 5" W. C.?
4. If above fails to eliminate the trouble, refer to
Check-out procedure
— troubleshooting
in this Supplement, Section VIII.
To place boiler in operation: