New installation, Lgb-6 to lgb-20, Series 2 – control supplement – Weil-McLain LGB 6-20 Series User Manual
Page 2
Part Number 550-141-816/0798
2
LGB-6 to LGB-20
Series 2 – Control Supplement
I
New installation
1. Remove all burners from base box assembly. Remove 3.95 mm natural gas main burner
orifices in manifold. Install 2.40 mm propane gas main burner orifices. Use pipe dope
sparingly only on male ends. Use pipe dope compatible with propane gases. Do not
overtighten orifices.
2. Install pilot burners and flame sensor(s). See Figures 1 and 2 (page 3). Follow Table 1,
below for electronic pilot burner (UCS), standing pilot burner (Q327) and flame sensor
locations on manifold.
3. Install gas controls and ignition control panel as shown in Table 2, below and Figure 6
(page 12).
4. Attach pilot switch box to interior jacket panel. See Figure 6 (page 12). Connect
thermocouple from standing pilot to switch box. Cut 60” pilot tubing into 2 pieces to
make connections from pilot valve to pilot switch box and from pilot switch box to
standing pilot.
5. Attach:
a. 550-223-710 label at boiler operating instruction label. Place so that this label reads
first.
b. 550-223-796 label at rating label.
c. Wiring diagram on door (one on each base).
IÃ
IÃ!
IÃ
IÃ!
IÃ
IÃ!
IÃ
IÃ!
IÃ
IÃ!
IÃ
IÃ!
GB7%
!
(
%
GB7 #
!
%
"
!$
'
!
GB7&
!
&
GB7 $
!
%
"
!&
'
!!
GB7'
!
"
'
GB7 %
!
'
$
!(
(
!#
GB7(
!
$
(
GB7 &
!
'
$
"
(
!$
GB7
!
%
(
GB7 '
!
!
%
""
(
!&
GB7
!
%
(
GB7 (
!
!
%
"#
(
!&
GB7 !
!
%
(
GB7!
!
!!
%
"%
(
!(
GB7 "
!
#
!"
&
(
ÃA ÃyrsÃi r
@yrp
vp
QvyÃ7
r
Thqvt
QvyÃ7
r
7vyr
Ã
HqryÃ
Iir
7vyr
Ã
HqryÃ
Iir
AyhrÃTr
@yrp
vp
QvyÃ7
r
AyhrÃTr
Thqvt
QvyÃ7
r
Table 1
Pilot burner and flame sensor
locations
Table 2
Gas control arrangement
GrsÃihr SvtuÃihr
GrsÃihr SvtuÃihr
GB7%
6ÃhqГ7
Е
GB7 #
D
Е
Е
GB7&
6ÃhqГ7
Е
GB7 $
E
Е
Е
GB7'
8ÃhqГ9
Е
GB7 %
E
Е
Е
GB7(
8ÃhqГ9
Е
GB7 &
E
Е
Е
GB7
@ÃAÃhqГB
ГуЕ
GB7 '
F
ГуЕ
Е
GB7
@ÃAÃhqГB
ГуЕ
GB7 (
G
ГуЕ
ГуЕ
GB7 !
@ÃAÃhqГB
ГуЕ
GB7!
G
ГуЕ
ГуЕ
GB7 "
C
Е
Е
7vyr
Hqry
Iir
Q
hr
8h
DyrÃQvrÃTvr
7vyr
Hqry
Iir
Q
hr
8h
DyrÃQvrÃTvr