beautypg.com

Overview and site preparation – Whirlpool WHER25 User Manual

Page 6

background image

6

Overview and Site Preparation

OVERVIEW

There are seven easy steps to installing your Drinking Water
system. They are as follows:

STEP 1 - Install Cold Water Supply fitting

STEP 2 - Install Drain Adapter

STEP 3 - Install Reverse Osmosis Assembly

STEP 4 - Install Storage Tank

STEP 5 - Install Reverse Osmosis Faucet

STEP 6 - Connect Tubing

STEP 7 - Sanitize, Pressure Test, Purge System

These steps are explained in detail over the next few pages.
It is recommended to read through the entire manual before
beginning your installation. Follow all steps exactly. Reading
this manual will also help you receive and use all the bene-
fits your Reverse Osmosis System can give you.

PREPARE SITE FOR INSTALLATION

1. Before starting, close the hot and cold water shutoff

valves (See Figure 5).

2. Temporarily place tank and filter assembly into cabinet.

Double check position of items and space required for
proper installation.

3. Remove tank and filter from cabinet and set aside.

NOTE: You must check and comply with all local plumb-
ing codes.

NOTE: Codes in the state of Massachusetts require
installation by a licensed plumber and do not permit the
use of saddle valves.
If you live in the state of Massachusetts, review plumb-
ing code 248-CMR of the Commonwealth of
Massachusetts before proceeding with the installation.

FIG. 4

Questions? Visit www.ecodyne.org or call Toll Free 1-866-986-3223