Overview and site preparation – Whirlpool WHER25 User Manual
Page 6
6
Overview and Site Preparation
OVERVIEW
There are seven easy steps to installing your Drinking Water
system. They are as follows:
STEP 1 - Install Cold Water Supply fitting
STEP 2 - Install Drain Adapter
STEP 3 - Install Reverse Osmosis Assembly
STEP 4 - Install Storage Tank
STEP 5 - Install Reverse Osmosis Faucet
STEP 6 - Connect Tubing
STEP 7 - Sanitize, Pressure Test, Purge System
These steps are explained in detail over the next few pages.
It is recommended to read through the entire manual before
beginning your installation. Follow all steps exactly. Reading
this manual will also help you receive and use all the bene-
fits your Reverse Osmosis System can give you.
PREPARE SITE FOR INSTALLATION
1. Before starting, close the hot and cold water shutoff
valves (See Figure 5).
2. Temporarily place tank and filter assembly into cabinet.
Double check position of items and space required for
proper installation.
3. Remove tank and filter from cabinet and set aside.
NOTE: You must check and comply with all local plumb-
ing codes.
NOTE: Codes in the state of Massachusetts require
installation by a licensed plumber and do not permit the
use of saddle valves.
If you live in the state of Massachusetts, review plumb-
ing code 248-CMR of the Commonwealth of
Massachusetts before proceeding with the installation.
FIG. 4
Questions? Visit www.ecodyne.org or call Toll Free 1-866-986-3223