beautypg.com

Performance checklist – Viking AF/AR User Manual

Page 25

background image

Performance Checklist

50

h

Verify cabinet size.

h

Verify electrical supply and water supply
(if applicable).

h

Install anti-tip device(s) and verify unit is
secure.

h

Position unit in cutout, level at desired
height, and secure unit.

h

Plug-in unit and verify operation.

h

Connect water supply (if applicable).

• Verify icemaker fill tube is properly

inserted.

• Verify icemaker bailarm is down.
• Verify dispenser operation

(if applicable).

h

Align/square door(s).

h

Verify drain pan is properly installed and
there are no leaks in water connection.

h

Install kickplate.

h

Remove internal packaging and labels
and wipe unit down.

Installer’s information:

Installer’s Name:

_____________________________

Installer’s Company:

_________________________

Date: ________________________________________

49

Open door. Display should flash.

Press “ACTIVATE CONTROLS” button pad and close

door.

Note: There is a 6 minute delay before the unit starts.

25

26