beautypg.com

Implementation details, Implementation details -2 – Verizon Network Manager Nodes User Manual

Page 26

background image

7-2

Version 1.08

January 15, 2008

Implementation Details

Figure 7-2: Implementation Details

4. Select Activate Trigger Points in the Trigger Point section to activate trigger points when the

plan is implemented. This option is only available if Trigger Points are in the plan.

5. De-select the As soon as possible option and select the date and time you want from the

Effective Date and Time field if you want the plan to implement in the future.

6. Select the Rollback option and date and time for the rollback from the Rollback Date and

Time section if you want to return to the current “plan in use.”

7. Click Submit. The Results of the IMPL request dialog appears (next page).