beautypg.com

Set-up, Shear pins, Chute clean-out tool – Troy-Bilt 2410 User Manual

Page 10

background image

Push the chute control rod toward the control panel until

7.

the hole in the rod lines up with the hole in the chute
control input closest to the chute control head and insert
the cotter pin. See Fig. 3-12.
NOTE: The second hole is used to achieve further
engagement of the chute control rod into the pinion
gear if required. Refer to page 19 for Chute Control Rod
adjustments.

Finish securing chute control head to chute support

8.

bracket with wing nut, clevis pin, and bow-tie cotter pin
removed in step 1. See Fig. 3-3.
Check that the cables are properly routed through the

9.

cable guide on top of the engine. Some models only have
one cable to route through the cable guide. See Fig. 3-13.
NOTE: For smoothest operation, the cables should all be to
the left of the hex rod.

Set-Up

Shear Pins

A pair of replacement auger shear pins and bow tie cotter pins
are included with your snow thrower. Store them in your snow
thrower’s dash panel until needed. See Fig. 3-14.

Chute Clean-Out Tool

The chute clean-out tool is fastened to the top of the auger
housing with a mounting clip and a cable tie at the factory. Cut
the cable tie before operating the snow thrower. See Fig. 3-15.

Figure 3-13

Figure 3-12

Figure 3-14

Chute Clean-Out Tool

Figure 3-15

10

s

ectiOn

3— a

sseMbly

& s

et

-u

p

This manual is related to the following products: