beautypg.com

Operating tips, Replacing shear pins – Troy-Bilt 4510 User Manual

Page 15

background image

Operating Tips

NOTE: Allow the engine to warm up for a few minutes. The

engine will not develop full power until it reaches operating

temperature.

WARNING!

The temperature of the muffler and

the surrounding areas may exceed 150° F. Avoid

these areas.

If possible, remove snow immediately after it falls.

1.

Discharge snow downwind whenever possible.

2.

Slightly overlap each previous path.

3.

Set the skid shoes 1/4” below the shave plate for normal

4.

usage. Adjust them upward for hard-packed snow and

downward when using on gravel or crushed rock.

Replacing Shear Pins

Each of the six auger spiral assemblies are secured to the spiral

shaft with a shear pin and cotter pin. If the auger should strike a

foreign object or ice jam, the snow thrower is designed so that

the pins may shear. If the augers will not turn, check to see if the

pins have sheared. See Fig. 5-1.

CAUTION:

Never replace the auger shear pins with

anything other than OEM Part No. 738-04155

replacement shear pins. Any damage to the auger

gearbox or other components as a result of failing to

do so will NOT be covered by your snow thrower’s

warranty.

WARNING!

Always turn off the snow thrower’s

engine and remove the key prior to replacing shear

pins.

To Engage Drive

Move the shift lever into one of the six forward (F) positions

1.

or two reverse (R) positions. Select a speed appropriate for

the snow conditions and a pace you’re comfortable with.

NOTE: Use slower speeds in higher snow and/or until you are

familiar with the snow thrower operation.

Squeeze the drive control against the handle the snow thrower

2.

will move. Release it and drive motion will stop.

CAUTION:

Never move the shift lever without first

releasing the wheel drive control. Doing so will

cause premature wear on the drive system’s friction

wheel

To turn the snow thrower to the left or right, squeeze the

3.

respective wheel steering control. Refer to Figure 4-1.

To Engage Augers

To engage the augers and start throwing snow, squeeze

1.

the auger control against the left handle. Release to stop

the augers.
While the auger control is engaged, squeeze the drive control

2.

to engage the interlock mechanism and to drive the snow

thrower. The interlock mechanism locks the auger control

so you can turn the chute control without interrupting the
snow throwing process.
Release the auger control; the interlock mechanism should

3.

keep the auger control engaged until the drive control is

released.
Release the drive control to stop both the augers and

4.

the wheel drive. To stop the auger, both levers must be

released.

Figure 5-1

Shear Pin

Cotter Pin

15

s

ectiOn

5 — O

peratiOn