B.4 pump flush, B.5 plumbing diagram, B-6 in app – Teledyne 10 User Manual
Page 68

BioOptix™ 10
Appendix B Fluid Path Diagrams
B-4
B.4 Pump Flush
A Pump Flush should be done whenever the system will be idle
for more than a few hours. (See sections 3.8 and 4.1.) The flush
removes salts from the Buffer in lines to the Mode knob (Figure
B-6).
Figure B-6 Pump flush
B.5 Plumbing Diagram
A complete plumbing diagram can be found on the following
page.
Buffer
Sample
Channel
Mode
Pump
Buffer A
Buffer B
To Pump Purge