Mechanical installation 110tb – Tannoy SUBWOOFERS User Manual
Page 15

7)
In this photo (Fig. 15) we have removed the threaded rod, and installed eyebolts with backing nuts into the couplers,
as described earlier. Detail of the connection with wire rope is shown in (Fig. 8), which is identical top and
bottom. Take measurements to approximate the lengths of rope you will need. It might be convenient to make
some, or perhaps all of your wire ropes on the ground, and use a quick link (Fig. 7) on each end to connect
between both the suspension point and at the subwoofer. Again, it is important to follow local code and regulations
for use of wire rope in overhead suspension. Check with your supplier for additional instructions on its use.
8)
Once two installers have raised the subwoofer to the ropes and the sub is safely suspended, it can be leveled by
adjusting the rope lengths. Check for even tension on all ropes, and note that it is much easier to let some wire
slip out of the tighter ropes, rather than trying to pull up and tighten the loose ropes. Once the subwoofer is level,
the installation is complete.
15
MECHANICAL INSTALLATION 110TB
Figure 13: Suspension points
with turnbuckles installed
Figure 14: Leveled subwoofer
Figure 15: Eyebolts in place of threaded rod
Figure 16: Leveling the subwoofer