RBH Sound A-615-70 User Manual
Page 10
8
I N S T A L L A T I O N
IMPORTANT:
This product must be installed in accordance with your local area’s building
codes and regulations. This may require use of an additional support bracket,
depending on the installation. In this case, use the MBR-70 described below.
SEISMIC TAB:
For proper installation, the seismic tab MUST be secured to a secondary
support in the event of failure of the primary support structure.
MBR-70:
(sold separately)
The MBR-70 consists of a round bracket and two rails designed to be used
with suspension ceilings. The rails will fit either 24” or 600
mm
tiles. They are
designed to rest on top of the tile without the “V” end of the rail grabbing the
grid struts. In the event that the tile falls, the “V” end of the rail will grab the
strut holding the speaker in place. The MBR-70 is not required for installation
when the speaker is being installed in drywall or other rigid material. When
installing in these surfaces, use attached swivel mounts and hole locating
template included in the box with each loudspeaker.
For suspension ceiling installation instructions, refer to the installation
manual included with the MBR-70.