beautypg.com

Shear bolt driveline installation, A-frame installation (standard hitch), Assembly – Rhino Mounts 148 User Manual

Page 95: Assembl y

background image

ASSEMBLY

148 02/11

Assembly Section 3-3

© 2011 Alamo Group Inc.

ASSEMBL

Y

SHEAR BOLT DRIVELINE INSTALLATION

Attach rear driveline of U-Joint to input Shaft on gearbox, install Snap Ring in groove on Input Shaft. NOTE:
Check that Snap Ring is properly seated in groove.
This Snap Ring retains Driveline when shear bolt shears.
Install Grade 2 (only) shear bolt 1/2” by 3-1/2”. Use of a stronger shear bolt than Grade 2, will result in driveline
failure and will void warranty.

A-FRAME INSTALLATION (Standard Hitch)

1.

Attach “A” Frames (1) to inside of welded hitch
brackets on Mainframe, insert Hitch Pin (12),
lockwasher (14) and install nut (13).

2.

Install the lift straps (3) on outside of top rails on
main shield (behind geabox mount) and attach
with 1/2” x 1-1/2” bolts (10) and locknuts (9).

3.

Insert spacer (7) into toggle (11) between “A”
Frames (1). Insert 3/4” x 6” bolts (8) through
hole in lift straps and spacer (7). Secure with 3/
4” locknut (9).

4.

Assemble driveline support flat (15) and retain
using 1/2’ x 1-1/2” bolt (10) and locknut (9).