A

Air Conditioning, 2-9

cooling capacity, 2-9

B

Blank Panels

installing, 5-17

C

Cable Restrictions

RAID, 3-3

Cable Summary, 3-2
Cabling Constraints, 3-2
Concentrator

installing, 5-14

Concentrator Cable Lengths, 3-3
Configuration Assistant, 1-2

E

Electrical Facilities, 2-10
Environmental Conditions, 2-4
Equipment Location

equipment, 2-2

F

Field Replaceable Units, 6-3

G

Grounding Requirements, 2-11

I

Illustrated Parts Breakdown, 6-1

K

Keyboard Tray

installing, 5-13

M

Monitor

connecting.

Monitor Tray

installing.

O

Options, 6-5

P

Power Distribution Unit

installing, 5-12
requirements, 2-10

R

Rack

configuration guidelines, 3-6
floor requirements, 2-5
leveling, 4-7
opening doors, 4-5
space requirements, 2-2
spacing components, 3-3
unpacking, 4-3

Rack Components

installing, 5-3

Rack Frame Link Kits

installing, 4-8

Rack Stabilizer

installing, 4-10

S

Server

master and protected, 5-10

Side Panels

removing, 4-6

System

configuring, 4-10

System Rack Models

Rack Models, 1-2

System Rack Placement, 2-7
System Rack, 42U, 1-3
System Rack, Multi-Bay, 1-5

T

Typical Configuration, 5-2

U

Uninterruptible Power Source (UPS, 2-10
UPS

installing, 5-4
interface expander accessory, 5-6
load calculation and battery run time, 3-8