beautypg.com

Figure 2 – Premier Mounts PP-5 User Manual

Page 2

background image

Installation

Instructions

Page

2

PP-5A INSTALLATION INSTRUCTIONS

The ceiling should be capable of supporting at least five (5) times the weight of the product that will be used with
this accessory. If the surface cannot support this weight, it must be reinforced. Proper installation procedure by
qualified personnel as outlined in the installation instructions must be adhered to. Failure to do so could result in
serious personal injury.

For adjustable suspension applications, the PP-5A can be mated directly to our APP-2446 suspension adapter.

Step 1. Install the PP-5A to the ceiling structure according to commercial standards (Figure 2).
Step 2. Use (commercially available) suitable hardware depending on the installation requirements.
Step 3. See Figure 2 for cable access and 360º rotation.
Step 4. Install the desired length of 1-1/2” diameter NPT pipe with the threaded ends attaching to the PP-5A.
Step 5. Tighten the M6 x 12mm screws to secure the pipe.

Figure 2

Bolt

Washer

Ceiling

Washer

Nut

Locking Screw - M6 x 12mm
Phillips Head Screw

PP-5A

Cable Access

1-1/2” Coupler

Commercially Available
Hardware