beautypg.com

Completing the console installation (p80), Threading the cable assembly (p30) – Precor AMT 835 User Manual

Page 35

background image

Installing the Console

33

Completing the Console Installation (P80)

Before you complete the final installation steps, double-check

the connections you have made. Make sure that all cables are

fully and securely connected, and that any unneeded cables

are tied back properly.

To complete the installation:
1.

Feed extra cable back into the neck tube.

2.

Tilt the control console backward (toward yourself) until

the tab on the top edge of its back plate slides along the

top edge of the console mount and the screw holes align

properly.

3.

Insert the four ⁵₈-inch flat head screws through the holes

in the console mount and thread them into the holes in

the back plate on the console. Partially tighten the screws

using a ⁵₈-inch hex wrench.

4.

Line up the two small tabs at the top of the console’s back

cover with the slots at the top of the opening in the

console case. Insert the tabs into the slots.

5.

Insert the remaining tabs on the back cover with the

corresponding slots on the console case.

6.

Press gently on the edges of the back cover to snap it into

place.

Threading the Cable Assembly (P30)

Earlier in the installation, you threaded the necessary cables

through the frame of the base unit and out the passthrough

opening in the console mount. As you line up the back plate

on the console with the console mount, you must make sure

that the cable assembly passes correctly through the

openings in both components.
Important: Before you begin the following procedure, remove the

rear cover from the control console. Set the cover and its mounting

hardware aside for later use.

This manual is related to the following products: