Step 5

1) Position the legs accordingly for best configuration.

You may raise or lower each leg independently by

turning the leveling barrels.

2) Secure the legs to the mount carriage by screwing

M6 x 12mm security screws into the M6 square nut

(do not overtighten) on the mounting legs.

3) Verify the position of the integrated sliding M6 square

nut in the mounting leg relative to a nearby slot on the

mount carriage.

If the M6 square nut is not aligned with any slot, you

can use any thin implement, such as a toothpick, to

nudge it into alignment.

Sliding M6

Square Nut

1) Identify the projector’s approximate front-to-back

center of gravity. Place your hands on each side of

the projector and gently lift it an inch from the surface

on which it is resting. Carefully adjust your grip on the

projector until it seems balanced from front-to-back.

Mentally note the apparent center of gravity.

2) Identify the projector’s approximate side-to-side

center of gravity. Place your hands on the front and

back of the projector and gently lift it an inch from the

surface on which it is resting. Carefully adjust your

grip on the projector until it seems balanced from

side-to-side. Mentally note the apparent center of

gravity.

3) Make sure the mount carriage is as close as possible

to the projector’s center of gravity.

Step 4

Side-to-Side

Center of Gravity

Front-to-Back

Center of Gravity

Mounting Hardware Too Long?

The depth of some projector mount points may

prevent you from tightening the M2.5 and M3

mounting hardware.

You can reduce the length of the M2.5 and

M3 mounting hardware by stacking up to a

maximum of five (5) M3 flat washers inside the

leveling barrel.

Avoid stacking too many M3 washers; the

mounting hardware must thread into the

projector mount point at least four (4) complete

turns.