beautypg.com

Installing on an i-beam – Polycom SPECTRALINK 6000 User Manual

Page 8

background image

1725-36127-001-F.doc

8

Installing on an I-Beam

Items provided :

Outdoor enclosure, Base Station

Items needed :

4 – “Caddy” or “B-Line” 3/8” Beam Clamps

4 – 1/2” long 1/4” x 20 bolts

4 – 2” long 1/4” x 20 bolts

4 – 1/4” x 20 nuts

1. Attach a beam clamp to the center of the top and bottom

flanges on the outdoor enclosure.

2. Attach a second beam clamp to each of the beam clamps on the

enclosure using a 1/2” long 1/4” x 20 bolt and a nut. (See
figure below.)

3. Attach the outdoor enclosure to I-beam using the beam clamps

attached in step 2.

See figures in Chapter 1 for pictorial data for the remaining steps:
4. Slide the Base Station cable through the compression fitting

and tighten the fitting.

5. Crimp on RJ45 onto the Base Station cable using the same

wiring guide as the indoor Base Station.

6. Plug the RJ45 into the RJ48C connector.

2