beautypg.com

Patton electronic 3012/V24 User Manual

Page 9

background image

137001UA

2-2

Setup & Installation

3012-14-18/V24

I

NSTALLATION

A

ND

O

PERATIONS

M

ANUAL

P

ATTON

E

LECTRONICS

C

O

.

JP4 and JP5 to

IN

IN

IN

IN

IN

Provided Pin 9 and 10 Test Voltage

JP6 to

OUT

OUT

OUT

OUT

OUT

CTS delay = No Delay

JP1, JP2 and JP3 to

IN

IN

IN

IN

IN

Factory Test Jumpers must be installed

3018/V24 (CTS MSD-8C)

Switch 9 - positions 4 and 6 to

OFF

OFF

OFF

OFF

OFF, 1, 2, 3 and 5 to ON

ON

ON

ON

ON

Anti-Stream = 40sec. and Disabled
Switching Mode = Priority
Signal Ground not connected to Chassis Ground

JP4 and JP5 to

IN

IN

IN

IN

IN

Provided Pin 9 and 10 Test Voltage

JP6 to

OUT

OUT

OUT

OUT

OUT

CTS delay = No Delay

JP1, JP2 and JP3 to

IN

IN

IN

IN

IN

Factory Test Jumpers must be installed

If the system application requires one or more of the default settings to be changed,
it will be necessary to remove the top cover of the enclosure to access and change
the DIP switches located on the printed circuit board.

Disassembly

Remove the top cover by unscrewing the phillips head screws located on the left and
right sides of the unit. The configuration switches and jumpers are located on the
PCB as indicated on the appropriate strapping guide in the Appendix of this manual.
After the switch selection activity is completed,

R

EINSTALL

T

HE

T

OP

C

OVER

BEFORE

C

ONNECTING

T

O

A

N

AC P

OWER

S

OURCE

.

This manual is related to the following products: