beautypg.com

Vtrak task list, Step 1: unpacking the vtrak – Promise Technology VTrak J610S User Manual

Page 2

background image

VTrak J610s, J310s Quick Start Guide

2

VTrak Task List

Step 1: Unpacking the VTrak (below).
Step 2: Mounting VTrak in a Rack

VTrak J610s (page 5)

VTrak J310s (page 7)

Step 3: Installing Disk Drives (page 10)
Step 4: Setting Up Data Cable Connections (page 14)
Step 5: Setting Up Serial Cable Connections (page 20)
Step 6: Connecting the Power (page 21)
Step 7: Setting Up the CLI Connection (page 22)

Step 1: Unpacking the VTrak

The VTrak J610s or J310s box contains the following items:

VTrak J610s or J310s Unit

Quick Start Guide

Front bezel and key

RJ11-to-DB9 serial data cable
(Units with one I/O module: 1)
(Units with two I/O modules: 2)

1.0m (3.3 ft) SAS cable
(Units with one I/O module: 1)
(Units with two I/O modules: 2)

Screws for disk drives
(J610s: 70, including 6 spares)
(J310s: 50, including 2 spares)

Left and right mounting rails

Left and right center-mount brackets

1.5m (4.9 ft) Power cords (2)

CD with Product Manual and Quick
Start Guide

Warning

The electronic components within the J610s and J310s units are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
J610s or J310s unit or its subassemblies.

This manual is related to the following products: