
STEP 7
1. Fasten the Front Rails and Front Mouldings to the Base while holding them flush with outside edge of Stand using 2
Locking Screws.
View from front of Stand
Front Rail
Front Rail
Front
Moulding
Front
Moulding
Ensure that Front Rail, Front Moulding and
Base are all flush on outside edge.