Wiring requirements, Smart control module – Lochinvar 1.5 User Manual
Page 10
10
4
Wiring Requirements
Figure 4-2_Control Inputs
ModBus Instructions
GAS PRESSURE SWITCHES
DHW THERMOSTAT /
SENSOR
ENABLING DEVICE
SYSTEM SENSOR -
SUPPLY
OUTDOOR SENSOR
SEQUENCER / BUILDING
MANAGMENT SYSTEM
LOW VOLTAGE
CONNECTION
BOARD
INLET TEMPERATURE
SENSOR
OUTLET TEMPERATURE /
HI-LIMIT SENSOR
FLUE GAS SENSOR
LOUVER PROVING SWITCH
FLAME SENSOR 1 & 2
LOW WATER CUTOFF
BLOCKED DRAIN SWITCH
DISPLAY PANEL
PC INTERFACE
SMART CONTROL
MODULE
AIR PRESSURE SWITCH
SYSTEM SENSOR -
RETURN
AUX SWITCH 1 & 2
0-10 INPUT FROM
SYSTEM PUMP
BLOWER PROVING
SWITCHES
CASCADE
INLET AIR SENSORS
MANUAL RESET
HIGH LIMIT
VENT DAMPER
PROVING SWITCH
MODBUS
BOARD
See also other documents in the category Lochinvar Water boiler:
- KNIGHT XL KBN800 (6 pages)
- SD (2 pages)
- Copper Fin II CF-1261 (1 page)
- EBS-SUB-02 (2 pages)
- Commercial Water Heater (2 pages)
- 999 - 750 (72 pages)
- JR-SUB-07 (2 pages)
- POWER-FIN PB/PF 2001 (4 pages)
- Squire SSS041 (20 pages)
- Knight Heating Boiler 81-286 (48 pages)
- 1302 (2 pages)
- CH/CF/CP 300-750 (4 pages)
- 000 (80 pages)
- Copper-fin CW-360 (1 page)
- CP-5M-4/08 (52 pages)
- 500 (68 pages)
- 000 - 260 (52 pages)
- 000 - 260 (52 pages)
- TNR-I&S-02 (20 pages)
- ARMOR 150 - 800 (36 pages)
- KNIGHT KB-500 (1 page)
- PB 502 thru 1302 (4 pages)
- PB-1302(M9) (1 page)
- MDN 030 (2 pages)
- 495 (52 pages)
- Hot Water Generator (24 pages)
- Heating Boilers KB 400 thru 801 (4 pages)
- SYNO 1.3 (16 pages)
- SQUIRE SIT119 (24 pages)
- Commercial Gas Glass Lined Tanke Type Water Heater CG200 (28 pages)
- COPPER-FIN CB-0745 (1 page)
- 0402-0752 (2 pages)
- 1.3 (56 pages)
- RPV-I&S (16 pages)
- KNIGHT 400 (48 pages)
- KNIGHT 210 (20 pages)
- Power Fin PF-0502 (M9) (2 pages)
- COPPER-FIN II 402 - 2072 (16 pages)
- 752 (16 pages)
- WATER HEATERS (12 pages)
- EFFICIENCY+ E B N 150 (2 pages)
- Sync Condensing Boiler 1.5 (56 pages)
- EB 150 -- 300 (4 pages)
- CW495-2066 (2 pages)
- CREST 2.5 (60 pages)