Replenishment rates – Kodak D-32 User Manual
Page 7
6
September 2009 D-32
Replenishment rates
Development/transport time and transport rates are set to achieve desired
photographic aims; replenishment rate settings are determined by multiplying
the transport speed by the required replenishment rates for the appropriate
film width being used.
Use the chart and formula provided to determine the developer and fixer
replenishment rates (mL/min) by multiplying transport speed (ft/min) (which is
determined by dividing the path length of the developer tank in feet by the
dwell time in seconds and multiplying by 60; see example) and the appropriate
processor replenishment specification (mL/linear ft).
NOTE: These are starting point recommendations. Actual settings may
require adjustments to maintain process activity levels. Shorter dwell
times are acceptable; however, exposure adjustments will be
necessary.
A calculation of replenisher rate follows:
For Processor:
Allen M-70 Processor
Type of Film:
35 mm (2468 Microfilm)
Dwell:
70 seconds
Developer Film Path:
84 feet
Replenishment (Dev):
2 (from table above)
Calculated transport speed:
84 ft x 60 sec/min = 72 ft/min
70 sec (transport speed)
Results:
72 ft/min x 2 mL/ft = 144 mL/min
replenishment rate for developer
Replenishment mL/linear ft
16 mm
35 mm
105 mm
Dev
Fix
Dev
Fix
Dev
Fix
Kodak Prostar
0.75
0.75
1.5
1.5
N/A
N/A
Deep Tank
1.00
1.25
2.0
2.5
6.0
7.5
Transport
speed X
(ft/min)
Replenishment/
feet of film =
(mL/Lft)
Replenishment
rate
(mL/min)