beautypg.com

Important, Side view – Spalding 21196804 User Manual

Page 10

background image

10

P/N 21196804 10/04

4

3

Fill hole completely with concrete.

6.

1" (2.54 cm)

5

1" (2.54 cm)

7.

Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions
several times while concrete is curing.

1" (2.54 cm)

SIDE VIEW

DRAINAGE HILL

IMPORTANT!:

CONTINUE ON TO NEXT STEP.

DO NOT WAIT FOR CONCRETE TO CURE.

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

PLAYING SURFACE

Make a reference mark

here for anti-skid tape.

NOTE A:

Keep flange pushed down

to concrete and leveled.

NOTE B: