DU-DR-0019-SC9000 Rev A 6/4/02 GCX Corp. Page 1 of 3

GCX Mounting Assembly Operation/Installation Manual

Dräger Model Fabius CE

®

with Siemens SC9000 Patient Monitor













Patient Monitor – Top Shelf / Power Supply on Right Side

The purpose of these instructions is to:

1. Describe attachment of GCX mounting hardware to the Fabius CE anesthesia machine.

2. Describe attachment of the Siemens monitor to the GCX mounting hardware.

WARNING: USE OF MOUNTING HARDWARE AND MONITORING COMPONENTS OTHER THAN THOSE
DESCRIBED

IN

THIS

DOCUMENT MAY RESULT IN SERIOUS INJURY DUE TO TIPPING OF THE

ANESTHESIA

MACHINE.


THIS FABIUS CE CONFIGURATION REQUIRES A COUNTERWEIGHT (DRAGER P/N: 8604076).


Installer: When installation is completed, provide these instructions to the end user for future reference.

INSTALLATION

RS Top Shelf Pan & Low Profile Tilt Swivel Mount

Install RS Housing Top Shelf Pan and Low Profile Tilt Swivel mount according to instructions included with those
assemblies.

Slide Pick & Go Base into Mounting Plate

1) Align the mounting adapter located at the bottom of the Pick & Go base with the edge of Mounting Plate. Slide the

Pick & Go base into the plate until it stops at the Spring Plunger (located below the Mounting Plate).

Pull the Spring Plunger and continue to slide the base until the mounting adapter engages the Spring Plunger. Tighten

the (4) nylon thumb screws on the back of the Mounting Plate.