beautypg.com

Installation – Sanyo POA-SR-140 User Manual

Page 5

background image

Please ensure that there is sufficient clearance around the unit at the time of installation, as shown in the
figure on the right.

Take out the Smoke Resistant Box from the
packaging and place it on a flat surface with the
projector.

Take off the connector cover from the Projector.

5

INSTALLATION

INSTALLATION

PRECAUTION BEFORE INSTALLATION

PRECAUTION BEFORE INSTALLATION

PRECAUTION BEFORE INSTALLATION

WARNING: DO NOT COVER INTAKE
VENTS.

If the Air Intake is covered, there will be in-
sufficient cooling which may result in failure
or fire.

CAUTION:UNPLUG THE PROJECTOR FROM THE AC OUTLET WHEN INSTALLING THE
SMOKE RESISTANT BOX.
ATTACHING THE SMOKE RESISTANT BOX WHILE THE PROJECTOR IS CONNECTED TO
ELECTRICITY MAY DAMAGE THE BOX OR CAUSE IT TO MALFUNCTION.

AIR INTAKE VENTS

At least 20'' (50cm)

30''

(75cm)

At least

At least

40''

(100cm)

FRONT

PROCEDURE OF INSTALLATION

PROCEDURE OF INSTALLATION

PROCEDURE OF INSTALLATION

1

2

CONNECTOR COVER

RETAIN THE CONNECTOR COVER.
WHEN THE SMOKE RESISTANT BOX IS NOT
BEING USED, REATTACH THE CONNECTOR
COVER TO THE PROJECTOR TO PROTECT
THE CONNECTOR.