Caution, 4 completing the installation of your granulator – Sterling EX909 User Manual
Page 19
Page 19
3. Look inside the base evacuation area. Spare parts, such as
combs, are often placed inside this area for shipping purposes.
! CAUTION !
The cutting chamber combs are EXTREMELY SHARP. Always wear heavy gloves
and exercise care when working in the cutting chamber.
4. Carefully inspect the interior of the cutting chamber and
evacuation area for foreign material or debris.
5. Noting the location of each segmented chamber, lower and
remove them from the cutting chamber by loosening the
handknob on each. Lift the rear of each segmented chamber
off of the rear support bar to aid removal. Carefully inspect the
interior of each segmented chamber for material or debris. See
Figure 5.
6. Wipe all interior surfaces clean.
7. Place the three (3) segmented chambers back into their original
position and tighten each handknob securely.
8. Verify that no material has been left inside the machine
9. Close the front base door and the hopper access door and
secure the latches.
! CAUTION !
Do not run granulator until upper machine assembly is fully latched down.
3-4
Completing the Installation of Your Granulator
1. Open the drive guard by removing the bolts that attach the
guard cover to the timing belt backing plate.
2. Check the timing belt for proper tension and alignment.
3. Upon completion, close the guard by placing the cover back
into position, insert all the bolts originally removed, and
tighten them fully.