6. If the engine has started, slowly return the choke lever

(Figure 12 ) to the

“OPEN”

position. If the engine has not

started repeat steps 1 through 5.

7. Before the generator is placed into operation, run the engine

for 3-5 minutes. Check for abnormal smells, fuel leaks, and
noises that would associate with lose components.

8. Refer to the AC voltmeter (Figure 16) on the control

box. The voltage indicated on the voltmeter should be
120 VAC with no load applied.

Figure 16. AC Voltmeter (120 VAC)

11. If desired, verify with a voltmeter (Figure17) that 120

VAC is present at the GFCI duplex receptacle and the
120V twist-lock receptacle (S/N 5497957 and above).

STOW G-2.9R — INITIAL START-UP ENGINE/OPERATION

Connecting the Load

1. Connect the load to the output receptacles.

2. Place the main circuit breaker (Figure 18) in the ON

position.

Figure 17. 120 VAC GFCI Receptacle

Stopping The Engine

Normal Shutdown

1. Place the

main circuit breaker (Figure 10) in the OFF

position.

2. Remove the load from the generator, and let the engine

run at idle for 3-5 minutes with the idle control switch in
the ON position (Up)

3. Place the

operation switch (Figure 17) in the OFF

position S/N 5497956 and below).

6. Place the engine

fuel valve lever

(Figure 21) to the "OFF"

position.

Emergency Showdown

1.

Place the

operation switch or engine ON/OFF swith

(Figures19 or 20) in the "OFF" position.

Figure 19. Operation Switch (OFF)

Figure 21. Engine Fuel Valve Lever (OFF Position)

Figure 20. Engine ON/OFF Switch (OFF)

5. Place the

engine ON/OFF switch

(Figure 20) in the "

OFF

"

position. This step applies to units with S/N 5497957 and
above.

Figure 18. Main Circuit Breaker (ON)