6. Install Link Wireless Telephone System
6.1 Survey Site
Check the site to be sure pre-installation work has been completed correctly. This
includes:
• Location chosen for the MCU is adequate, and power is available.
• Wiring to Base Station locations has been pulled and correctly terminated.
• Phone lines for the Link Wireless Telephones are installed and properly
terminated.
• Dedicated line is available for remote access to diagnostic modem.
• Telephone system administrator is on-site to program the existing telephone
system.
If the work has not been completed, the SpectraLink field service engineer can leave
the site and reschedule the installation when the items have been completed or
corrected, or assist in preparing the site.
6.2 Check Components
The following items should be at the installation site.
Link 150 M3 Master Control Unit Depending on the size of your system,
there may be up to four MCUs, which will be chained together to extend the
coverage area.
The Link WTS MUST contain only Link 150 M3 MCUs. Link 150 Model
2 MCUs or Model 1 MCUs cannot be used in an M3 system.
AC Adapter Supplies power to the Link 150 M3 MCU.
Use only the provided Class II AC Adapter with output 24VDC, 1A.
IPC Cable Each MCU is shipped with one inter-processor communication
(IPC) cable to carry signals between Link 150 M3 MCU units. It is used only
when multiple MCUs are chained together.
Base Stations SpectraLink Part Number RCC 400/410 or RCO 400/410 (for
outdoor use). Your system may have up to four Base Stations for each MCU
shipped.
Base Station Mounting Hardware A ceiling clip and plastic bolt used to
attach each Base Station to the T-bar ceiling tile grid.
MCU Mounting Hardware Four #8 x 3/4” panhead wood screws and star
washers, used to mount the MCU to the wall.