beautypg.com

Heating system piping – Smith Cast Iron Boilers GB100W User Manual

Page 8

background image

Page 8

GB100W NATURAL OR PROPANE BOILER

INSTALLATION AND OPERATING INSTRUCTIONS

Fasten the vent damper to the flue collar and vent pipe
using at least 3 corrosion resistant sheet metal screws
per joint. Connect the damper harness to the top panel
with the BX connector supplied. Plug the Molex
connector on the damper harness into the mating plug
on the harness located inside the control compartment.

The vent damper is operating properly when it opens
completely upon a call for heat and closes completely
when the call for heat ends. The vent damper must be
in the open position when the boilers main burners are
in operation.

Figure 3: Vent Damper Location

HEATING SYSTEM PIPING

CAUTION: All piping must be installed by a qualified
technician in accordance with the provisions set
forth in the applicable ANSI/ASME standards and
local building codes and regulations. Improper
piping of this boiler can cause flooding, extensive
property damage, heating system damage or
damage to the boiler.

The GB100W hot water boiler comes from the factory
ready to be piped to the heating system. Each boiler is
equipped with a safety relief valve. This valve must be
piped in accordance with the ANSI/ASME Boiler and
Pressure Vessel Code, Section IV. Figure 4 provides a
pictorial description of the boiler and piping components.

Figure 4: Heating System Piping

FRONT OF

BOILER

DAMPER BLADE POSITIONED
FRONT TO BACK OF BOILER

MOTOR TO FACE
FRONT OF BOILER

DISCHARGE PIPE
SIZE TO EQUAL
VALVE OUTLET.
DO NOT RESTRICT
FLOW.

SUPPORT DISCHARGE PIPING
SO AS TO AVOID STRAIN ON
THE VALVE BODY.

DISCHARGE SO AS TO AVOID EXPOSURE OF PERSONS TO
HOT LIQUID OR VAPOR. LEAVE OPEN END V ISIBLE FOR
PERIODIC INSPECTION FOR SLOW LEAKAGE OR DRIPS.

1" CLEARANCE MUST BE

MAINTAINED BETWEEN

HOT WATER PIPING

AND COMBUSTIBLE

CONSTRUCTION.

FOR DISCHARGE

THROUGH ROOF

CONSULT THE

SMITH CO.