Installing your dryer – Samsung DV219AGW User Manual
Page 7
installing your dryer
_7
installing your dryer
TOOLS NEEDED FOR INSTALLATION
Hire a professional to install this dryer properly. If there is a service call performed as a result of poor setup,
adjustment, and connection, it is considered the responsibility of the installer. If you install the dryer you are
responsible.
Make sure you have everything necessary for proper installation.
1. A GROUNDED ELECTRICAL OUTLET is required. See Electrical Requirements. See page 12.
2. A POWER CORD for electric dryers (except Canada). See page 13.
3. GAS LINES (if a gas dryer) must meet national and local codes.
4. EXHAUST SYSTEM – must be rigid metal or flexible stiff-walled metal exhaust ducting.
See the exhaust requirements on pages 8-10.
SEE DRYER EXTERIOR
01 installing your dryer
Adjustable legs
Control panel
Door
DV219AGW-02691A_EN.indd 7
2009-01-30 ¿АИД 6:19:21