Rerun switchtest, B. if the test fails again, replace the switch, A. replace the cable – Sun Microsystems 6900 User Manual
Page 85: B. rerun switchtest, Return the path to production, Sun proprietary/confidential: internal use only

Chapter 5
Troubleshooting the Fibre Channel (FC) Links
65
Sun Proprietary/Confidential: Internal Use Only
5. Rerun
switchtest
.
a. If
switchtest
fails, replace the GBIC and rerun
switchtest
.
b. If the test fails again, replace the switch.
6. If
switchtest
passes, assume that the suspect components are the cable and the
Sun StorEdge T3+ array controller.
a. Replace the cable.
b. Rerun
switchtest
.
7. If the test fails again, replace the Sun StorEdge T3+ array controller.
8. Return the path to production.
9. Return the Sun StorEdge T3+ array LUNs to the correct controllers, if a failover
occurred. (Determine if failovers occur using the
luxadm failover
or
failbackt3path
commands.)
This manual is related to the following products: