To isolate the a3 or b3 fc link, Break the connection by uncabling the link, Run switchtest – Sun Microsystems 6900 User Manual
Page 78: B. if the test fails again, replace the switch, Return the path to production, Sun proprietary/confidential: internal use only
This manual is related to the following products: