beautypg.com

Southbend SB-10-ES User Manual

Page 9

background image

O

VEN

/ S

MOKER

I

NITIAL

S

TART

-U

P

I

NSTALLATION

& O

PERATIONS

M

ANUAL

1189200 R

EV

0 (12/06)

P

AGE

9

OF

24

IMPORTANT: Please install any required drainage plumbing at this time. Any required drain
line must be properly installed before attempting an INITIAL START–UP and Operational
Check.

* * * NOTICE * * *

NATIONAL SANITATION FOUNDATION GUIDELINES REQUIRE THAT

ALL INTERIOR PARTS BE REMOVABLE WITHOUT THE USE OF TOOLS.

THIS EQUIPMENT HAS BEEN FACTORY ASSEMBLED TO SAFELY

ACCOMMODATE ROUGH HANDLING THROUGH SHIPMENT AND

ORIGINAL INSTALLATION. AFTER ANY MAINTENANCE, CLEANING OR

REQUIRED SERVICE WORK THE INTERIOR SHEET–METAL PARTS

SHOULD BE REASSEMBLED AND FASTENED HAND–TIGHT ONLY, BUT

STILL REMAIN TIGHT ENOUGH TO PREVENT ANY RATTLE OR

MOVEMENT OF PARTS.

IMPORTANT: THIS UNIT NEEDS TO BE INSTALLED WITH ADEQUATE
BACKFLOW PROTECTION TO COMPLY WITH APPLICABLE FEDERAL,
STATE AND LOCAL CODES.

IMPORTANT: THIS UNIT REQUIRES A SCREEN OF AT LEAST 100 MESH
TO BE INSTALLED IMMEDIATELY UPSTREAM OF ALL CHECK VALVE
TYPE BACKFLOW PREVENTERS USED FOR WATER SUPPLY
PROTECTION. THE SCREEN SHALL BE ACCESSIBLE AND REMOVABLE
FOR CLEANING OR REPLACEMENT.

This manual is related to the following products: