beautypg.com

Electrical installation of spa after delivery – Sundance Spas 850 Series User Manual

Page 14

background image

1

Electrical Installation Of Spa After Delivery

Safety Notice for -Wire 10 VAC or -Wire 10/0 VAC Models

(Includes Solo, 0 Metro And 0 Denali, Tacoma Models)

Refer to page 12 for 3-wire 240 VAC powered models.

Proper grounding is extremely important. A pressure wire connector is provided to permit connection
of a bonding wire between the spa and any metal object or appliance within 5 feet. Bonding wire
must be at least #8 AWG (8.4 mm

2

) solid copper wire.

1. To gain access to the spa’s power terminal strip, remove the four screws securing the center

synthetic cabinet panel under the control panel. After removing the cabinet panel, remove the
four control box cover screws (Figures 5-6).

2. Inlets are provided to allow the power supply to enter the equipment area from either side of

the spa near the base (Figure 5). Select the inlet you want to use, then feed the power cable
through to the control box.

3. Install the power cable with a connector through the large opening provided at the bottom of

the control box (Figure 6).

4. Connect power wires, color to color, to main TB1 terminal strips (Figures 7A-7B) and tighten

securely.

5. Reinstall the control box door and side cabinet panel. Electrical installation is now complete.