Smith Cast Iron Boilers GB300 User Manual
Page 29

GB300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS
Page 29
The jacket should be assembled using the black screws
provided. On 5 through 12 section models slide the rear
panel behind the draft hood flanges with the grill side on
the floor, Figures 68, 69 & 70. On 13 to 21 section boilers
open Box 55185, Jacket Splice Box, Figure 71. Screw
the two rear jacket panels to the rear jacket panel splice
panel, Figure 72, before sliding the panels behind the
draft hoods.
Figures 68
Rear Panel Installation, 5 through 12
Figures 69
Rear Panel Installation, 5 through 12
Figures 70
Rear Jacket Panel Installation Detail
Figures 71
Box 72694, Jacket Splice Box
Figures 72
Rear Panel Installation, 13 through 21
Fasten the rear jacket panel(s) to the inner draft hood
and flue collector flanges using the holes provided,
Figure 73.
Figures 73
Rear Panel Installation