beautypg.com

Installing control / power connection – Jacuzzi Dome For Shower Surround System None User Manual

Page 15

background image

5. Installing Control / Power Connection

Installation of all control / wiring devices must be according to manufacturer’s in-
structions and comply with local codes.

PREPARE FOR CONNECTIONS AS FOLLOWS:
1. Ensure the power supply wiring (supply branch circuit) has been disconnected and

de-energized.

2. Trim excess length of both supply branch circuit and cold lead cables, as necessary, leaving a

minimum of 6

"

projecting from the ECB.

3. Prepare each cold lead conductor for splicing/termination: Carefully remove black outer jacket.

Avoid damage to the underlying copper braid. Separate braid wires from cold lead; tightly
twist braid strands together. Strip

1

/

2

" of cold lead conductor insulation. Fig. 5.

4. Strip

1

/

2

" of insulation from supply circuit conductors.

5. Connect wires as noted in installation instructions.
6. Do not energize the system until the mortar / grout materials have fully set – refer to the

manufacturer’s instructions for cure time. This will ensure that the mortar and grout setting will
not be compromised by the heat from the cables.

Fig. 5

13