Installing control / power connection – Jacuzzi Dome For Shower Surround System None User Manual
Page 15
5. Installing Control / Power Connection
Installation of all control / wiring devices must be according to manufacturer’s in-
structions and comply with local codes.
PREPARE FOR CONNECTIONS AS FOLLOWS:
1. Ensure the power supply wiring (supply branch circuit) has been disconnected and
de-energized.
2. Trim excess length of both supply branch circuit and cold lead cables, as necessary, leaving a
minimum of 6
"
projecting from the ECB.
3. Prepare each cold lead conductor for splicing/termination: Carefully remove black outer jacket.
Avoid damage to the underlying copper braid. Separate braid wires from cold lead; tightly
twist braid strands together. Strip
1
/
2
" of cold lead conductor insulation. Fig. 5.
4. Strip
1
/
2
" of insulation from supply circuit conductors.
5. Connect wires as noted in installation instructions.
6. Do not energize the system until the mortar / grout materials have fully set – refer to the
manufacturer’s instructions for cure time. This will ensure that the mortar and grout setting will
not be compromised by the heat from the cables.
Fig. 5
13