beautypg.com

3 wall: tower and curved glass installation – Jacuzzi Summer Rain 2 Wall and 3 Wall User Manual

Page 24

background image

STEP 13
Turn on water supply and check for leaks. Correct any
leaks before installing tower cover.

STEP 14
Install tower cover as shown. Insert cover at top first.

3 WALL: TOWER AND CURVED GLASS INSTALLATION

TOWER COVER

INSERT THIS SIDE FIRST

TOWER COVER

TOWER TOP PLATE

STEP 15
Seal all around the base of tower with silicone sealant.
Also seal the inside of both wall posts, bottom of both
glass panels on the inside only.

22

TOP VIEW

(RAILS NOT SHOWN)

APPLY SEALANT
ALONG BASE
OF GLASS

APPLY SEALANT
ALONG BASE
AND SIDE OF
WALL POST

APPLY SEALANT
ALL AROUND
TOWER BASE