beautypg.com

3 wall: tower and curved glass installation – Jacuzzi Summer Rain 2 Wall and 3 Wall User Manual

Page 23

background image

3 WALL: TOWER AND CURVED GLASS INSTALLATION

STEP 9
Secure the rails.

STEP 10
Tighten the tower base bolt. Two shut-off valves are
provided. To hook up supply lines, unscrew valves from
braided line. Using thread sealant, screw valve to stub
outs at bottom of tower. Then reconnect braided line
using provided gasket. Do not twist or kink supply lines
when connecting.

SHUT OFF
VALVES
(PROVIDED)

COLD

HOT

BOLT

STEP 11
Install cover cap on wall post.

STEP 12
Install glazing gasket on curved glass wall post on the
outside. Note orientation of gasket. Soapy water may
help to insert the glazing gasket. On the inside of
enclosure, apply sealant the entire length of glass and
wall post as well as the entire length of glass and tower.

COVER CAP

WALL POST

GLASS

GLAZING GASKET

INSIDE OF
ENCLOSURE

APPLY SEALANT

GLAZING
GASKET

INSIDE OF
ENCLOSURE

APPLY
SEALANT

TOWER TOP PLATE

21