beautypg.com

3 wall: tower and curved glass installation – Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS User Manual

Page 22

background image

3 WALL: TOWER AND CURVED GLASS INSTALLATION

STEP 5
Insert support rails into brackets in top moulding of tower
but do not tighten at this time.

STEP 6
Slide mounting bracket covers and mounting brackets
onto front rail and tower support rail.

TOWER SUPPORT RAIL

FRONT RAIL

RAIL WALL

MOUNTING BRACKET

MOUNTING

BRACKET

COVER

RAIL

STEP 7
Place the front rail and tower support rail against the
walls. Check level and mark the position for the rail
mounting bracket. The screw position will be above the
rail. Drill the wall with a 3/16" bit and secure bracket with
screws and wall anchors provided.

ATTACH RAIL
BRACKET TO WALL

SECURE RAIL TO
BRACKET (TURN CW
TO TIGHTEN)

MOVE COVER CAP
OVER BRACKET

STEP 8
Adjust the rails until tower is vertical in 2 planes.

20