Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS User Manual
Page 14
2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION
TOWER COVER
INSERT THIS SIDE FIRST
TOWER COVER
TOWER TOP PLATE
12
STEP 16
Turn on water supply and check for leaks. Correct any
leaks before installing tower cover.
STEP 17
Install tower cover as shown. Insert cover at top first.
STEP 18
Seal all around the base of tower with silicone sealant.
Also seal the inside of both wall posts, glass post and the
bottom of both glass panels on the inside only.
TOP VIEW
(RAILS NOT SHOWN)
APPLY SEALANT
ALONG BASE
OF GLASS
APPLY SEALANT
ALONG BASE
OF GLASS
APPLY SEALANT
ALONG BASE
AND SIDE OF
WALL POST
APPLY SEALANT
ALONG BASE
AND SIDE OF
WALL POST
APPLY SEALANT
ALL AROUND
TOWER BASE
APPLY SEALANT
AROUND
GLASS POST