beautypg.com

Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS User Manual

Page 14

background image

2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION

TOWER COVER

INSERT THIS SIDE FIRST

TOWER COVER

TOWER TOP PLATE

12

STEP 16
Turn on water supply and check for leaks. Correct any
leaks before installing tower cover.

STEP 17
Install tower cover as shown. Insert cover at top first.

STEP 18
Seal all around the base of tower with silicone sealant.
Also seal the inside of both wall posts, glass post and the
bottom of both glass panels on the inside only.

TOP VIEW

(RAILS NOT SHOWN)

APPLY SEALANT
ALONG BASE
OF GLASS

APPLY SEALANT
ALONG BASE
OF GLASS

APPLY SEALANT
ALONG BASE
AND SIDE OF
WALL POST

APPLY SEALANT
ALONG BASE
AND SIDE OF
WALL POST

APPLY SEALANT
ALL AROUND
TOWER BASE

APPLY SEALANT
AROUND
GLASS POST