Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS User Manual
Page 12
STEP 11
Secure the rails.
10
ATTACH RAIL
BRACKET TO WALL
SECURE RAIL TO
BRACKET (TURN CW
TO TIGHTEN)
MOVE COVER CAP
OVER BRACKET
STEP 9
Place the front rail and tower support rail against the
walls. Check level and mark the position for the rail
mounting bracket. The screw position will be above the
rail. Drill the wall with a 3/16" bit and secure bracket with
screws and wall anchors provided.
STEP 10
Adjust the rails until tower is vertical in 2 planes.
2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATION
STEP 12
Tighten the tower base bolt. Two shut-off valves are
provided. To hook up supply lines, unscrew valves from
braided line. Using thread sealant, screw valve to stub
outs at bottom of tower. Then reconnect braided line
using provided gasket. Do not twist or kink supply lines
when connecting.
SHUT OFF
VALVES
(PROVIDED)
COLD
HOT
BOLT