beautypg.com

Placing tower – Jacuzzi F258000 User Manual

Page 14

background image

12

PLACING TOWER

ILLUSTRATION 11

7. Dry fit tower pins into holes to check hole location. Apply sealant around the three tower wall holes on the

bath and around the perimeter where the tower will sit. (See Illustration 11.)

8. Place the tower pins in the holes and push the tower down firmly. The tower will stand temporarily on its

own. Clean off excess sealant.

9. Place the U-extrusion against the wall edge, set back 13/32" from front edge. Drill three (3) 1/8" holes into

the wall and U-extrusion. Put sealant on the mating surface of the U-extrusion, or on the wall, and secure the
U-extrusion to the wall with the stainless steel screws, R.

CAULK

SET BACK 13/32"

M4.2X19MM
STAINLESS STEEL

SCREW

QTY.-3

R