beautypg.com

Disassembly instructions – Jacuzzi F258000 User Manual

Page 13

background image

11

5. Attach Hot and Cold water supply lines of the mixer to the stub-out supply lines. (See Illustration 10.)

6. Locate the on/off handle and temporarily place it on the mixer valve. (See Illustration 26 on page 19.) With the

mixer valve in the OFF position, turn on the water supply. Check for leaks at all connectors. Seal any leaks
and continue.

ILLUSTRATION 10

Although the J-Shower Tower is shipped partially assembled, it will have to be partially disassembled to
install. After removing packing materials, follow the instructions below.

1.

Remove end cap on the lower track. (Page 18, illustration 24.)

2.

Remove the top ring. (Page 15, illustration 19.)

3.

Remove the fixed panel with bottom rail. (Page 14, illustration 15 .)

4.

It is not necessary to remove bails or wall bar. Water connections will have to be removed to apply sealant.

DISASSEMBLY INSTRUCTIONS

HOT WATER
SUPPLY LINE

COLD WATER
SUPPLY LINE

HOT/COLD WATER
STUB-OUT WITH
VALVES
(NOT PROVIDED)

48" HOSE