beautypg.com

Ives 112HD Series User Manual

Installation instructions, Determine hinge height, Cut hinge

background image

!

829168-00(1)

© 2006 Ingersoll-Rand Company Limited

112HD & 224HD Series Concealed Continuous Hinges

Installation Instructions

829168-00

CAUTION

Please follow the installation instructions carefully. Not doing so may result in improper installation and void

the manufacturer’s guarantee. These hinges have a permanent, factory applied lubricant. Removal or

alteration of this lubricant, anodizing or painting of the product in the field will void the guarantee.

Note: All standard length hinges are supplied slightly shorter than nominal door height to avoid threshold or carpet-

ing clearance problems. All uncut hinges are templated and non-handed. Use the same model for both right and left

hand openings. If hinge is longer than door and needs cut, follow instructions below. Once the hinge is cut it becomes

handed because the cut end must go on bottom.

Determine hinge height.

1

Cut hinge.

2

Fold hinge so that channel is up.

Starting on channel, cut through entire hinge

along line.

Debur all cut edges with file.

A.

B.

C.

If hinge is taller than door, hinge must be cut to match

door height. Hinge must not be taller than door height.

Mark hinge with line where cut is needed.

INSTALLATION NOTES

No reinforcing is necessary except on extremely high frequency, extremely heavy

or extra-wide doors. Rivet nuts are required in the frame and door when door

weight exceeds 450 pounds (up to 600 pounds).

If the mullion is between the doors, treat as a single door installation. If the

mullion is behind the doors, treat as a double door installation.

Reinforcing and Rivet nuts:

Pairs of Doors with Mullions:

3

If more than 13.5” is cut from

bottom of hinge, a set screw

bearings will be cut off. This

set screw bearing is required

for proper operation.

In this case remove the set

screw bearing from the cut off

section by loosening set

screw and sliding back

channel.

Loosen set screw(s) on

hinge, slide back channel,

and replace a non set screw

bearing with a set screw

bearing.

Slide channel back into place

and tighten all set screws.

A.

B.

C.

D.

Special note, when cutting off

more than 13.50”.

HINGE CUTTING (IF NECESSARY)

Set screw

bearing

Channel

CAUTION

83”, 85”, and 95” hinges require 2 set

screw bearings.

120” hinges require 3 set screw bearings.

!

This manual is related to the following products: