Ice frost generic (pre-mix), Ice frost generic (post-mix) – Cornelius ICE FROST User Manual
Page 11

Ice Frost Operator’s Manual
© 2004-2006, IMI Cornelius Inc.
- 7 -
Publication Number: M620919596OPR
B
OWL
L
OADING
O
PERATIONS
Ice Frost Generic (Pre-mix)
WARNING: If the unit runs out of product and is turned off and turned back on without a new
(full) product tank installed the sensor will look for product for 4 minutes. During this 4
minute period CO
2
will be purged from the bowl.
Ice Frost Generic (Post-mix)
• Switch the machine’s main switch to the ON position (1).
• Put the switch (A) into the ON position (1) see FIGURE 5,
switch A. Controls the flow of the product in the bowls.
• The machine’s bowls will now fill up until the maximum level
is reached.
• Continue with start up operations.
FIGURE 5
• Switch the machine’s main switch to the ON position (1).
• Make sure the switch (L1) is in the OFF position (0) -
FIGURE 6 - (switch L1 controls the flow of the products in the
bowls).
• Turn mixing motors OFF immediately. Do not run units with
bowls empty.
• Using an 1/8 inch (8 mm) socket wrench (E1), loosen the nut
that holds the post-mix valve (D1).
• Twist nozzle counter-clockwise (F1), lift the post-mix valve
(D1) up slightly and turn it towards the outside. leaving
nozzle and coupling attached to the bowl.
FIGURE 6